Regular Stone Carpets are uniquely intended for application to a proper under-floor. This ought to, nonetheless, be dry and liberated from dust. Any old glues should initially be eliminated. The floor temperature ought to be something like 12NC.

Cement and Cement-Bonded Floors

Laying this sort of ground surface on a substantial or concrete reinforced floor is normally not an issue for prepared staff gave the floor ultimately depends on the quality standard required. And that implies it should be even and liberated from chips. To forestall any compression/development of the under-floor it is educated the joining regarding shrink netting, 6-150mm width in the sand/concrete layer. You can as a rule organize this ahead of time with the worker for hire.

Where sand/concrete floor is as of now set up, an adaptable layer can be utilized to make up for any compression in the under-floor and forestall breaking. The under-floor will be adequately solidified and dried following 28 days for the Natural Stone Carpet to be laid. Contingent upon the under-floor, the preliminary might be applied and the rug laid in a couple of days.

Tiled and Flagged Floors

Tiles and hailed flooring doesn’t normally need to be eliminated. Free tiles or joints ought to anyway be eliminated. On the principal day of laying, an extraordinary tile preliminary should be applied to guarantee most extreme grip. Any lopsidedness in the tiled floor will be evened out on the second day when the Natural Gravel Floor is being laid. Remember that tiled and hailed floors generally require an extra amount of the Natural material.

Anhydrite Floors

These floors should constantly Steinteppich be sanded in advance. An anhydrite floor should be given a layer of exceptional epoxy preliminary.

Lumber Under-floors

On account of lumber floors, the development of the under-floor should be ended. This is finished by fixing watertight cement boards, laid level next to each other with a hole between of 3mm and screwed at 25cm stretches. Whenever wanted, you can lay this under-floor yourself. Next a supposed ‘scape’ layer to the lumber under floor should be applied to get greatest grip for your new stone ground surface.

Floor Heating for Natural Stone Carpets

Floor warming isn’t totally vital. This kind of ground surface feel considerably less cold than a tiled floor, for instance. For most extreme solace, nonetheless, floor warming can positively be introduced in mix with stone ground surface in an adaptable completion. The floor warming ought to be kept separate from the substantial under. It is prudent that a protection layer or developer’s foil are applied over the substantial. The wires are cut to mesh encompassed by edging to make up for any extension of the sand/concrete layer.